
Project Cases · Express logistics
East China Distribution Center Automation Upgrade
01
Project challenge
Engineered to meet operational requirements
02
Delivery
Planning, manufacturing, installation and commissioning
03
Project Cases
Full lifecycle project support
Project Video
Project video / Site demo
Show project operation, commissioning, customer acceptance or system-integration footage to make delivery capability easier to evaluate.
Video placeholder
A project video can be uploaded in the CMS, or maintained as a YouTube / Bilibili / LinkedIn / other social video link.
01
Project challenge
The existing sorting system could not absorb peak parcel volumes. Manual sorting increased error exposure, while the constrained site had to remain operational during the upgrade.
02
Engineered solution
CHDTECH deployed cross-belt sorting, intelligent conveying, singulation and DWS in modular phases to keep the operation running.
03
Project outcome
Improved sorting efficiency and peak stability while reducing manual handling and error risk.
